OIL & GAS

SPECIALIST SOLUTIONS FOR OIL & GAS PROJECTS

Our innovative approach to craneage solutions for the Oil & Gas sector focuses on removing complexity from the project and facilitating more modular construction, resulting in:

  • Fewer cranes
  • Accelerated programme to commercialisation
  • Lower project costs, and
  • Most importantly, the platform for improved safety, higher quality and ‘greener’ construction.

Our solutions are scoped to suit the project footprint and layout with an underlying goal to reduce the number of lifts and therefore, the number of cranes. Each solution considers four main aspects:

  • High capacity and long reach
    - Increased modularisation & larger structures
    - Options on laydown and pre-assembly areas
  • Heavy and high-volume lifting
    - Increased productivity
    - Faster delivery to workface – fewer logistics resources
  • Ability to operate in windier conditions – increased availability, less down time
  • Small footprint – frees up valuable laydown areas and transport routes

Unique Features & Benefits:

  • Increased capability to lift in larger, modularised packages & pre-assemblies as a single component – due to the greater lifting capacity of Marr’s cranes – (330T@15m, 100T@45m, 25T@100m, 12T@120m)
  • Greater flexibility – ability to choose between site built or modularisation depending on:
    - Long lead equipment delivery
    - Site congestion
    - Multiple work front operations
  • The ability to choose is enhanced through high volume construction lifting, long crane reach and heavy lift capacity from a single location
  • De-risking delivery delays – by readily adapting installation sequencing by combining reach and capacity to lift components ‘over the top’ of an already installed plant
  • Improving onsite logistics – a small footprint (equivalent to two cars parked side-by-side) frees up much needed construction space and allows the crane to be positioning in tight, congested locations – ideal for the replacement of large components on operational plants
MARR M2480 D MTS ALB Feb2020
MARR M2480 D MTS ALB Feb2020
WE WORK WITH YOU TO FIND AN EFFICIENT ENGINEERING SOLUTION BEYOND THE CAPABILITIES OF TRADITIONAL CRANEAGE – REGARDLESS OF THE LOCATION, SIZE OR COMPLEXITY OF THE JOB.
  • Marr Transit System (MTS) - a modular rail system that provides full crane capability with minimal ground preparation. Ideally suited to the installation of product streams or trains, the MTS offers:

    - Increased site coverage with minimum impact on space
    - A reduction in the number of cranes required, removing site bottlenecks & reducing de-rigs & re-rigs
    - Superior positioning of crane solutions compared to traditional craneage avoiding the need to decommission and move cranes as the build continues

Ultimately, our proposals remove complexity from the construction solution through:

  • Fewer cranes with no impact on nett hook availability
  • A reduction in crane movements
  • The elimination of sequencing limitations
  • Simplified lift planning from an “at-height” perspective
  • Increased availability and productivity.

LET'S TALK ABOUT HOW WE COULD ADD VALUE TO YOUR PROJECT

We work with our clients to find a solution that works – no matter how big or complex the job is. And if the right crane doesn’t already exist, we’ll build one to suit the needs of your project.