HEAT EXCHANGE VESSEL REMOVAL

HEAT EXCHANGE VESSEL REMOVAL

An innovative craneage solution for a leading copper smelting plant.

SHARE

PROJECT OVERVIEW

When our client – a leading processor and exporter of refined copper and precious metal by-products – decided to replace the plant’s decommissioned heat exchange vessels, they contacted Marr for a heavy lift craneage solution that could be completed safely within a scheduled shutdown and without disruption to operations.

LET'S TALK ABOUT HOW WE COULD ADD VALUE TO YOUR PROJECT

We work with our clients to find a craneage solution that works – no matter how big or complex the job is.

Marr Crane Silhouette
Client
UNDISCLOSED
Project
HEAT EXCHANGE VESSEL REMOVAL
Location
SOUTHEAST ASIA
Sector
OIL & GAS
Date
JULY – OCTOBER 2019
Cranes

1 x M2480D

THE CHALLENGE

Working over a live refining and smelting plant with limited space, during a scheduled shut down – the question was how quickly and safely can we turn this around with as little disruption to operations as possible?

OUR SOLUTION

Employing the Marr Crane Mat System and one of our Marr 2480D tower cranes to dismantle the structures in large manageable pieces (weighing up to 180t), our approach minimised the risks associated with working at height with limited space on the ground.

Downside arrow
THE RESULT

With less lifting and a quicker deconstruction program, the overall risk on the project and to plant operations was reduced. Our solution allowed the refinery to return to production earlier than originally planned.