TX TOWER DECONSTRUCTION

TX TOWER DECONSTRUCTION

A collaborative approach to dismantling a Sydney landmark

SHARE

PROJECT OVERVIEW

Built in 1965, the former TCN-9 TX transmission tower at Willoughby was one of Sydney’s most recognisable landmarks for more than 50 years.

The 233-metre lattice tower replaced what was Sydney’s first television tower, built in 1956, and was one of three towers known as ‘the Artarmon triangle’ that broadcast television on behalf of major media companies before being decommissioned in February 2021.
When our client, Mirvac, acquired approval to redevelop the site into a new residential community in 2017, they knew they needed to remove the tower – they just didn’t know how.

After an exhaustive global search to find the best experts, Mirvac assembled a team of leading Australian and international engineers and contractors including Marr Contracting, Robert Bird Group and critical infrastructure experts, Kordia, to come up with a solution for designing and managing the process of dismantling the tower.

LET'S TALK ABOUT HOW WE COULD ADD VALUE TO YOUR PROJECT

We work with our clients to find a craneage solution that works – no matter how big or complex the job is.

Marr Crane Silhouette
Client
MIRVAC
Project
TX TOWER DISMANTLE
Location
SYDNEY, AUSTRALIA
Sector
DEPLANTING & DEMOLITION
Date
2017-2021
Cranes

1 x M310D & 1 x M1280D

THE CHALLENGE

Safely dismantling the tower posed a number of challenges due to its size, height and unique structure, as well as its proximity to residential homes and one of Sydney’s busiest freeways.

After exploring a number of more traditional methods of deconstruction – including using a gin pole or helicopters, which would have required shutting down the freeway – Mirvac approached Marr to come up with a solution using our tower cranes and bespoke equipment.

Because the decommissioned tower was not able to accommodate lateral supports, the challenge from a cranage point-of-view was to find a way to get the crane hook height above 233 metres without the need to build expensive and complicated temporary structures to support the crane. And of course, safety was paramount.

OUR SOLUTION

After 18 months of consultation, planning and peer review with the project stakeholders including our lead engineering consultants, Robert Bird Group, to initially assess what was structurally feasible with our existing specialist equipment, we designed a unique approach involving the use of our M2480D tower system and the introduction of guy wires to laterally support the tower crane and allow it to climb to the required height to dismantle the tower.

The solution evolved to a freestanding Favelle Favco M310D on 193 meters of tower sections, which gave an underhook height of 248 meters. The crane was attached to a single set of stayed guywires at a midpoint (81 meters above ground) anchored into the bedrock via four independent foundations which were each 41 metres from the centreline of the tower.

To reduce the number of lifts required, Marr also designed a changeover of cranes, swapping out the 16-tonne capacity M310D used to remove the top parts of the tower, to a 150-tonne capacity M1280D heavy lift luffer (HLL) to remove complete layers of the tower weighing up to 60 tonnes.

Marr’s involvement in the project also included providing Mirvac with engineering, procurement and construction (EPC) services to assist in the dismantling of the tower.

Downside arrow
THE RESULT

By the time it came to make the first lift and remove the top sections of the tower in August 2021, Sydney was in full lockdown due to the COVID-19 pandemic. Despite the additional logistical challenges posed by lockdown restrictions, by October 2021 the tower was safely dismantled, three months ahead of schedule and without incident.

Removing the tower in larger sections also eliminated the need for temporary works and the associated engineering to support the tower structure in its partially dismantled state. The solution with the larger crane reduced the lifting requirements from 90 planned lifts to just 36 larger lifts, which had a direct benefit to the project in terms of safety, program and cost.

ABOUT US

We’re not just a crew and cranes for hire. We’re big thinkers and problem solvers who love a challenge. No problem is too big for us.

OUR PHILOSOPHY

We believe that the crane needs to suit the job, not the other way around. We don’t just hire cranes – we design craneage solutions.

OUR HERITAGE

We’re a third-generation family-owned and run business with a strong sense of tradition and loyalty engrained in what we do and how we work together.

OUR PEOPLE

We think of our team as ‘one big family’ of problem-solvers who love cranes and the challenge of working on complex, large-scale projects.

OUR APPROACH

We work with you to find an engineering solution that works. Delivering value through the unique combination of our knowledge, experience, proven service delivery and people.

OUR SERVICES

We’ve worked on some of the most complex and challenging large-scale construction projects across Australia and around the world.

OUR CRANES

We don’t just hire cranes – we design them. So, if the right crane for your job doesn’t already exist, we’ll build one.

OUR PROJECTS

With almost 100 years’ experience, we have a reputation for taking on projects that others can’t or won’t.

SAFETY, QUALITY & ENVIRONMENT

We take on the jobs that many others can’t or won’t – but we always put good business practices first.

SUSTAINABILITY

We take sustainability seriously. It’s inherent in our commitment to finding the best and most efficient solution to every job.

SOCIAL IMPACT

As problem-solvers who love a challenge, we are never shy of tackling the big issues.

DIVERSITY

We are committed to creating a diverse, inclusive and flexible workplace that reflects the clients and communities we work with.