Bridges

SPECIALIST SOLUTIONS FOR BRIDGE CONSTRUCTION

Marr’s craneage solutions for suspension and cable-stayed bridge tower erection accelerate construction by providing high-volume and high-capacity cranes that:

  • Reduce the number of critical path lifts required
  • Maximise component sizes
  • Utilise high-speed winches to lift faster.

Early engagement with us opens the possibility to incorporate crane capability in tower component design providing the opportunity to:

  • Lift larger pre-cast and structural steel components
  • Lift heavier pre-assembles and modules
  • Maximise offsite fabrication and pre-assembly.

UNIQUE FEATURES & BENEFITS

  • Low carbon offsite fabrication and pre-assembly possible
  • Decrease in temporary works on bridge tower and critical path activities
  • Reduction in the need for working at height
  • Increased availability in high wind speeds – our cranes are rated to operate in wind conditions of up to 20m/second resulting in increased utilisation and availability
  • Small base footprint – offering improved logistics on tower bases to improve efficiencies
  • Larger crane tower design permits greater free-standing height.

SHARE

LET'S TALK ABOUT HOW WE COULD ADD VALUE TO YOUR PROJECT

We work with our clients to find a craneage solution that works – no matter how big or complex the job is. And if the right crane doesn’t already exist, we’ll build one to suit the needs of your project.

Marr Crane Silhouette

RELATED PROJECTS

Marr’s M2480D the solution to a challenging over-rail urban development

Arenco (NSW)

A game changing solution for the world’s longest span suspension bridge.

DL E&C–LIMAK–SK ECOPLANT–YAPI MERKEZI JOINT VENTURE (DLSY JV)