
TRANSFORMING NUCLEAR CONSTRUCTION THROUGH INNOVATIVE CRANAGE SOLUTIONS
MARR’S UNIQUE APPROACH UNLOCKS A MORE EFFICIENT, STREAMLINED AND SAFER METHOD OF DELIVERING HIGH CAPACITY, HIGH-VOLUME LIFTING SOLUTIONS IN NUCLEAR CONSTRUCTION.
Leveraging our heavy lift fleet – including the world’s highest capacity luffing tower crane, the M2480D – our innovative approach challenges traditional thinking to directly reduce the number of critical path lifts, enabling:
- Larger, heavier modular, pre-assembled & component lifts– reducing handling & accelerating production on critical path activities
- Fewer cranes, resources & deliveries – leading to simpler logistics & a more efficient overall operational solution
- Safer & more sustainable outcomes – with fewer lift operations lowering risk, cutting emissions & improving environmental performance.

UNIQUE FEATURES & BENEFITS
HIGH CAPACITY & HIGH-VOLUME LIFTING:
- The world’s highest capacity luffing tower crane (M2480D)
- 330T@15m, 150T@30m, 100T@40m,50T@65m & 12T@120m
- High speed winches
- 55T on main – 16.2T @ 95 m/min – 25T on fly jib – 5T @ 136 m/min
LONG-REACH & HIGH-CAPACITY:
- At max. configuration, the M2480D reaches nearly ¼ km and covers 45,000 m2– Ability to lift a minimum 12T anywhere in the45,000 m2 envelope
SMALL SITE FOOTPRINT:
- Tower footprint – 4.3m x 4m on cast-in anchors – Optional modular rail system (MTS) extends reach & coverage
HIGH AVAILABILITY:
- Rated to safely operate in windspeeds of 20m/s providing higher uptime.
SHARE
LET'S TALK ABOUT HOW WE COULD ADD VALUE TO YOUR PROJECT
We work with our clients to find a craneage solution that works – no matter how big or complex the job is. And if the right crane doesn’t already exist, we’ll build one to suit the needs of your project.

RELATED PROJECTS
- POWER GENERATION
- UNITED KINGDOM
A heavy lifting solution for the UK’s biggest construction project
Balfour Beatty Civil Engineering