Power Generation

SPECIALIST SOLUTIONS FOR POWER GENERATION & RENEWABLE ENERGY PROJECTS

Our innovative approach to craneage solutions for the power generation and Waste-to-Energy (WtE/EfW) sector aims to reduce the number of lifts required, resulting in:

  • Fewer cranes
  • Accelerated programme to commercialisation
  • Lower project costs, and
  • Most importantly, the platform for improved safety, higher quality and ‘greener’ construction.

Scoped to suit the individual plant size and layout of each project, Marr’s solutions support Designed for Manufacture & Assembly (DfMA) construction, offering:

  • Increased capability to lift in:
    • steam drums as a single component, thus avoiding onsite welding, heat treatment & testing.
    • headers complete and boiler tube banks in larger configurations reducing onsite welding & testing
    • turbine components
  • Fewer cranes matched with smaller crane footprints releases laydown & onsite construction areas
  • Complete site coverage with minimum impact on space
  • Increased daily lifting measured in tonnage rather than the number of lifts.

UNIQUE FEATURES & BENEFITS

  • High lift capacity – allowing upsized components, increased modularisation & more extensive offsite prefabrication & pre-assembly
  • Long reach capability – 120m radius delivering greater hook availability over a larger area for scheduled and unscheduled lifting
  • Small base footprint – equivalent to two cars parked side-by-side, freeing up much needed construction space & requiring reduced building stand-off
  • Marr Transit System (MTS) – modular rail system that provides full crane capability with minimal ground preparation
  • Ideally suited to the installation of large footprint buildings, the MTS offers:
    • increased site coverage with minimum impact on space
    • a reduction in the number of cranes required, removing site complexity
    • a crane movement that tracks building progress
  • Operational in winds of up to 20m/ second – increased availability in higher wind speeds and weather vane capability in extreme weather eliminates site laydown requirements
  • HVO100-compatible – up to 90% reduction in CO2 emissions when using 100% renewable diesel.

SHARE

LET'S TALK ABOUT HOW WE COULD ADD VALUE TO YOUR PROJECT

We work with our clients to find a craneage solution that works – no matter how big or complex the job is. And if the right crane doesn’t already exist, we’ll build one to suit the needs of your project.

Marr Crane Silhouette

RELATED PROJECTS

A cranage solution to withstand the ‘Fremantle Doctor’

UNDISCLOSED

A heavy lifting solution for the UK’s biggest construction project

Balfour Beatty Civil Engineering

Launching the world’s largest capacity tower crane into the Middle East

KEPPEL SEGHERS