When the Northwest Rapid Transit (NRT) consortium– including MTR Corporation, John Holland, CPB Contractors, UGL Rail and Plenary Group – was awarded the operations, trains and systems contract for Stage 1 of the Sydney Metro Northwest line they contracted Marr to come up with a craneage solution that needed thinking outside the box, literally.

Sydney Metro Castle Hill Station | MARR

LET'S TALK ABOUT HOW WE COULD ADD VALUE TO YOUR PROJECT

We work with our clients to find a craneage solution that works – no matter how big or complex the job is.

Marr Crane Silhouette
Client
NORTHWEST RAPID TRANSIT (NRT) CONSORTIUM
Project
SYDNEY METRO (NORTHWEST) CASTLE HILL STATION
Location
SYDNEY AUSTRALIA
Sector
MAJOR INFRASTRUCTURE
Date
2016-2018
Cranes

1 x M2480D

1 x M1680D

THE CHALLENGE

Working alongside a 200m x 30m cut-and-cover station box in a congested site that was landlocked between two existing roads to lift loads weighing up to 60 tonnes.

OUR SOLUTION

With a 330-tonne capacity M2480D and 200-tonne capacity M1680D installed along the station box, our solution provided lifting capacity across the entire site without the need for costly groundworks.